Serving Dallas–Fort Worth / North TexasResidential + construction + commercial plumbingCall 469-469-7483
For builders and GCs

New construction plumbing for builders and GCs in Dallas–Fort Worth

Rough-in, top-out and fixture set for production and custom homes. We work to your schedule, keep the jobsite moving and pressure-test our own work before inspection.

All servicesPlumbing scope by phase

Plumbing that keeps up with the build schedule

Rough-in, top-out and fixture set for production and custom homes. We work to your schedule, keep the jobsite moving and pressure-test our own work before inspection.

  • Under-slab and above-slab DWV, water lines and vents
  • Top-out after framing, including tub and shower valve set
  • Fixture set and trim-out
  • Pressure testing and inspection prep
  • Lot and subdivision work across DFW
Request a bid Framed house under construction with roof trusses and plumbing rough-in
What to tell us

How the bid works

  1. Send the plans, lot address and stage
  2. Tell us the dates you need us on site
  3. We review the scope and return the bid
Use the estimate or bid form so the team has the details before replying.
Call 469-469-7483
Rough-in to trim-out

One crew from the slab to the final walk.

We take the plumbing package from ground rough through fixture set, or step in for the stage you need covered. Pipe, grade, vents and pressure tests stay with the same crew, so the next trade is not waiting on us.

Working with builders

Built around your schedule, not ours.

Send the lot list and the dates you need rough-in and top-out. We confirm what we can cover, put it in writing and keep your superintendent in the loop when the schedule moves.

Certifications and coverage

Licensed, HUB and WBE certified.

Medina Cuba Plumbing is a licensed Texas plumbing contractor and holds HUB and WBE certifications — the credentials public and private projects require. We work across Dallas–Fort Worth and North Texas.

Common questions

Before you send the request.

What do you need to price a construction plumbing bid?

Send the plans or a written scope, the lot or project city, the stage you are at and the date you need us on site. If you have an ITB or a plan link, include it.

Which stages can you take?

Rough-in, top-out and fixture set. Some builders hand us the whole plumbing package, others bring us in for one stage. Tell us which stages you want covered.

Can we start before the plans are final?

Send what you have. We will review it, flag what is missing and tell you what has to be settled before we can give you a firm bid.

Do I need finalized plans to get a bid?

You can start with the project city, type, stage, scope and expected timeframe. Add an ITB or plan link when you have one so the bid starts from the right numbers.

Keep exploring

Related plumbing services.

Open the service that matches the scope, then send the estimate or bid form with those details.

Request a bid
CallGet estimate