Top-out plumbing after framing.

After framing, we run the vents and water lines, set the tubs and shower valves, and pressure-test the system so insulation and drywall can move forward.

All servicesWhat this service covers

Top-out plumbing after framing.

After framing, we run the vents and water lines, set the tubs and shower valves, and pressure-test the system so insulation and drywall can move forward.

  • Vent and water line installation
  • Tub and shower valve setting
  • Pressure testing for inspection
  • Coordination with insulation and drywall schedules
  • Punch list and correction work
Request a bid
What to tell us

What to share

  1. Send the lot list and the stage
  2. Tell us when the house will be framed
  3. We schedule the crew and test the work
Use the estimate or bid form so the team has the details before replying.
Call 469-469-7483
Common questions

Before you send the request.

How soon after framing can you top out?

Send the lot list and the framing dates. We look at the schedule and confirm when the crew can be on site so insulation is not held up.

Do you set tubs and shower valves during top-out?

Yes, that is part of the stage. If the tub or valve is not on site yet, tell us, and we will plan the visit around what is available.

Who handles inspection corrections?

If the inspector flags something on our work, we take care of it. Send the correction list and we will get it done before the next inspection.